Continuous Annealing Furnace

Heat Treatment · LPG cylinder production line

Heat Treatment
Continuous Annealing Furnace
The cylinder annealing furnace uses a high-temperature flame to burn the workpiece and perform annealing heat treatment on the cylinder. It consists of a burner, combustion chamber, fume hood, track, chain conveyor and exhaust system. Bottle transfer time is settable and operation is automatic with automatic furnace-temperature control - easy to operate, with a good annealing effect and no pollution.
  • Temperature uniformity±5 °C
  • Gas or electric heating—
  • Multi-zone PLC control—
  • Lead time60–90 days
  • Warranty12 months
Key Features

What we got right in the design

±5 °C furnace uniformity

Preheat, heat, soak and cooling are controlled in separate zones, keeping hardness and microstructure spread small across the load.

Waste-heat recovery

Off-gas from the hot zone preheats combustion air through a recuperator, reducing specific energy consumption by about 15%.

Interlocked discharge

The furnace is interlocked with upstream and downstream equipment: a blockage slows the line instead of over-firing the load.

Specification

Technical data

Standard machine data below. Non-standard sizes can be tooled to your cylinder drawings.

Workpiece sizeΦ310–Φ580 mm
Throughput≈20 s/pc (≈180 pcs/h)
Furnace temp.≈820 ℃
SpeedAdjustable
Dimensions15000 × 1200 × 1000 mm
Total weight≈7000 kg
Power supplyAC 380 V / 50 Hz, 3-phase + N + PE (customized to destination)
ProtectionControl cabinet IP54, actuators IP65
Lead time60 – 90 days after contract effectiveness
Related

More machines in this section

All products
Get a Quote

Tell us your cylinder and target output

The more specific your information, the more accurate the quote. Ideally include: cylinder size (1 / 5 / 12.5 / 15 / 25 / 50 kg), sheet thickness, target daily output, existing process and available floor area.

  • ResponseWithin 4 working hours
  • ProposalPreliminary layout in 48 h
  • ConfidentialityNDA available