Testing · LPG cylinder production line

Test pressure, hold time and verdict are stored and traceable to the individual cylinder — ready for customer and regulator audits.
Cylinders that fail are diverted and marked by the machine, never mixed back into the good flow.
Inspection cycle is designed to the line takt, so testing does not become the bottleneck; dual stations raise throughput further.
Standard machine data below. Non-standard sizes can be tooled to your cylinder drawings.
| Pneumatic pressure | 0.6 MPa |
|---|---|
| Hydrostatic test pressure | 3.2–3.4 MPa (fine-tunable) |
| Drain air pressure | 0.6 MPa |
| Filling time | ≈50 s |
| Hold time | 30 s |
| Drain time | ≈50 s |
| Throughput | 2.5 pcs/min (≈150 pcs/h) |
| Weight | 3.5 T |
| Power supply | AC 380 V / 50 Hz, 3-phase + N + PE (customized to destination) |
| Protection | Control cabinet IP54, actuators IP65 |
| Lead time | 60 – 90 days after contract effectiveness |
The more specific your information, the more accurate the quote. Ideally include: cylinder size (1 / 5 / 12.5 / 15 / 25 / 50 kg), sheet thickness, target daily output, existing process and available floor area.