JiangYan District, TaiZhou City, JiangSu Prov., China +86 138 1448 0488 lpgcn@aliyun.com
CNEN
Get a Quote

Electrostatic Powder Coating Line

Surface Finishing · LPG cylinder production line

Surface Finishing
Electrostatic Powder Coating Line
The JP-series electrostatic spraying and drying line for steel cylinders is composed of an electrostatic generator, powder-spraying room, powder recovery unit, energy-saving hot-air drying system, far-infrared heating and drying system, and overhead suspension conveyor. Electrostatic spraying is available in two forms: electrostatic liquid spraying and electrostatic powder coating.
  • Film thickness60–120 μm
  • Spray guns12
  • Curing at 200 °C—
  • Lead time60–90 days
  • Warranty12 months
Key Features

What we got right in the design

Controlled film thickness

Film thickness is monitored inline and spray parameters adjusted, keeping colour difference and coverage inside the acceptance range.

High powder recovery

Venturi recovery in the spray booth reuses over 95% of overspray, lowering consumable cost in long runs.

Heavy-duty option

For coastal or salt-spray service, an arc-sprayed zinc base layer can be added under the topcoat.

Specification

Technical data

Standard machine data below. Non-standard sizes can be tooled to your cylinder drawings.

Supply220 V, 50 Hz
Output voltage0–80 kV
Short-circuit current<220 µA
Constant current50 µA
Power consumption<0.1 kW
Fluidizing air pressure0.01–0.05 MPa
Gun trigger voltage24–36 V
Gun air pressure0.01–0.15 MPa
Powder output3–13 kg/h
Spray guns7
ColourMonocolour
Cylinder range12 / 35 / 45 kg
Power supplyAC 380 V / 50 Hz, 3-phase + N + PE (customized to destination)
ProtectionControl cabinet IP54, actuators IP65
Lead time60 – 90 days after contract effectiveness
Related

More machines in this section

All products
Get a Quote

Tell us your cylinder and target output

The more specific your information, the more accurate the quote. Ideally include: cylinder size (1 / 5 / 12.5 / 15 / 25 / 50 kg), sheet thickness, target daily output, existing process and available floor area.

  • ResponseWithin 4 working hours
  • ProposalPreliminary layout in 48 h
  • ConfidentialityNDA available