Surface Finishing · LPG cylinder production line

Film thickness is monitored inline and spray parameters adjusted, keeping colour difference and coverage inside the acceptance range.
Venturi recovery in the spray booth reuses over 95% of overspray, lowering consumable cost in long runs.
For coastal or salt-spray service, an arc-sprayed zinc base layer can be added under the topcoat.
Standard machine data below. Non-standard sizes can be tooled to your cylinder drawings.
| LPG fired | — |
|---|---|
| Cost | 1/3–1/4 of electric |
| Modular heater | — |
| Coating thickness | 60 – 150 μm (per process) |
| Conveying | Overhead chain / roller |
| Environmental | Dust collection + off-gas treatment |
| Power supply | AC 380 V / 50 Hz, 3-phase + N + PE (customized to destination) |
| Protection | Control cabinet IP54, actuators IP65 |
| Lead time | 60 – 90 days after contract effectiveness |
The more specific your information, the more accurate the quote. Ideally include: cylinder size (1 / 5 / 12.5 / 15 / 25 / 50 kg), sheet thickness, target daily output, existing process and available floor area.