JiangYan District, TaiZhou City, JiangSu Prov., China +86 138 1448 0488 lpgcn@aliyun.com
CNEN
Get a Quote

Energy-Saving Hot-Air Drying Furnace

Surface Finishing · LPG cylinder production line

Surface Finishing
Energy-Saving Hot-Air Drying Furnace
The factory produces energy-saving hot-air drying furnaces heated by LPG, whose operating cost is about 1/3 to 1/4 of electric heating. The combined heater simplifies the whole circulation system and reduces heat loss, while the air ducts are arranged so that all parts of the furnace reach a uniform temperature, achieving an ideal airflow pattern through the inlet and outlet layout.
  • LPG fired—
  • Cost1/3–1/4 of electric
  • Modular heater—
  • Lead time60–90 days
  • Warranty12 months
Key Features

What we got right in the design

Controlled film thickness

Film thickness is monitored inline and spray parameters adjusted, keeping colour difference and coverage inside the acceptance range.

High powder recovery

Venturi recovery in the spray booth reuses over 95% of overspray, lowering consumable cost in long runs.

Heavy-duty option

For coastal or salt-spray service, an arc-sprayed zinc base layer can be added under the topcoat.

Specification

Technical data

Standard machine data below. Non-standard sizes can be tooled to your cylinder drawings.

LPG fired—
Cost1/3–1/4 of electric
Modular heater—
Coating thickness60 – 150 μm (per process)
ConveyingOverhead chain / roller
EnvironmentalDust collection + off-gas treatment
Power supplyAC 380 V / 50 Hz, 3-phase + N + PE (customized to destination)
ProtectionControl cabinet IP54, actuators IP65
Lead time60 – 90 days after contract effectiveness
Related

More machines in this section

All products
Get a Quote

Tell us your cylinder and target output

The more specific your information, the more accurate the quote. Ideally include: cylinder size (1 / 5 / 12.5 / 15 / 25 / 50 kg), sheet thickness, target daily output, existing process and available floor area.

  • ResponseWithin 4 working hours
  • ProposalPreliminary layout in 48 h
  • ConfidentialityNDA available